(Incorporating amendments effected
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Category A' | Industrial Estates of Gurgaon, IMT Manesar, Faridabad, Industrial Estate/EPIP Kundli, Rai and Panchkula Technology Park |
| Category 'B' | Industrial Estates of Bahadurgarh, Bawal and Panchkula. |
| Category 'C' | All other Estates other than those mentioned above. |
The allotment of plots/sheds will be on an ongoing basis in the following cases as provided in the Industrial Policy 2005: -
Projects having investment of Rs. 30 crore & above
Projects being set up by NRIs / PIOs
Units with 33% or more FDI in total investment
Allotment of land for IT Industry (Manufacturing and Software Development)
The applications in respect of all these categories shall be made to and processed by HSIIDC, as per Haryana Government Notification no. 2/1/22-1 IBII-2005 dt 24.05.2007 (Annexure-I).
Besides the above, the allotment of plots/sheds in Industrial Estates falling in category C, will also be on on-going basis.
For other categories, allotments will be made after inviting applications through advertisements in leading newspapers.
| 1. | Allotment of plots to projects having investment of Rs.30 crore and above will be made by the following committee:- | ||
| (a) | Principal Secretary Industries | Chairman | |
| (b) | MD, HSIIDC | Member | |
| (c) | MD, HFC | Member | |
| (d) | Director of Industries | Member | |
| 2 | For other projects including those under FDI, NRI, PIOs categories, IT industry (manufacturing & software development) and general category, allotments will be made by the following committee:- | ||
| (a) | MD, HSIIDC | Member | |
| (b) | MD, HFC | Member | |
| (c) | Director of Industries | Member | |
| Senior-most member will act as Chairman of the Committee. At-least one member, besides MD, HSIIDC should be present in all meetings to complete the quorum. Substitution can be made in extreme exigencies with an officer of the level of at-least General Manager / Joint Director. | |||
| 3 | There will be 10% reservation of plots/sheds in each Estate for allotment to NRIs/PIOs and for units with 33% or more FDI in total investment. | ||
| 3A | There will be upto 2% reservation of plots/sheds in each Estate for allotment to persons with disabilities as defined in the Persons with Disabilities (Equal Opportunities, Protection of Right and Full Participation) Act, 1995. For complete details in this regard, Haryana Government Notification No. 49/40/07/4IBI dated 13.03.2007 (Annexure-II) may be referred. | ||
| 4 | Preference will be given to the
following categories of entrepreneurs.
|
||
PAYMENT OF PROCESSING FEE
The applicant shall be required to deposit application form alongwith processing fee (non-refundable) as hereunder:
Size of Plot (Sq. mtr.) |
Category-A |
Category B & C |
Upto 500 |
Rs.5000/- |
Rs.3500/- |
501-1050 |
Rs.7500/- |
Rs.5500/- |
1051-4050 |
Rs.10000/- |
Rs.7500/- |
4051-8100 |
Rs.15000/- |
Rs.10000/- |
Above 8100 |
Rs.25000/- |
Rs.17500/- |
The fee levied by the Corporation will be inclusive of service tax, if applicable.
PAYMENT TERMS
Note: In case of NRIs/PIOs, the funds towards the price of the plot should come from his / her NRI account.
The application form duly filled-in will be received by HSIIDC alongwith the following documents:-
LETTER OF ALLOTMENT
The applicants recommended by the Allotment Committee will be issued Regular Letter of Allotment (RLA) indicating the plot number, size, dimensions and rate of allotment along with the schedule and terms of payment.
PERIOD ALLOWED FOR GOING INTO PRODUCTION
The allottee shall be required to implement the project on the industrial plot within a period of 3 years from the date of offer of possession. Implementation of the project would mean commencement of commercial production. However, the allottee should, as far as possible, take following steps within a period of two years:-
The period for implementation of the project can be extended by HSIIDC for a period of one year subject to the allottee having completed construction equivalent to 20% of Permissible Covered Area (PCA) in case of plot size is upto one acre and 10% of PCA in case plot size is more than one acre. Further, the allottee will satisfy the Corporation that he could not go into production within three years from the date of offer of possession for reasons beyond his control and he took effective steps for implementation of the project.
Second extension of one year for completion of project i.e. after four years from the offer of possession will be granted only in exceptional circumstances.
In case of sheds, the allottee shall be required to implement the project within two years from the date of offer of possession. The period for starting production shall be extended by one year in those cases where the allottee has installed / placed orders for substantial part of plant and machinery and depending on merit of each case.
The allottee shall be required to pay extension fee prescribed for that area and the payment shall be made w.e.f. the date the extension is applicable and for any delayed payment, interest @ 11% shall be charged.
Extension fee at following rates shall be charged:-
| Sr.No. | Category | Plots (Rs. per sq. mtr.) | Sheds (Rs. Per sq. ft. Covered area) | |
| Ist year | 2nd year | |||
| 1 | Category A | 75 | 150 | 30 |
| 2 | Category B | 40 | 80 | 15 |
| 3 | Category C | 15 | 30 | 6 |
The procedure to grant extension in implementation of projects for industrial plots allotted under the previous policies shall be governed as per their respective agreements / RLAs subject to payment of extension fee as mentioned above in case there is no deviation. No extension fee shall be charged upto three years from the date of offer of possession.
In case of any deviations from the laid down guidelines / norms with respect to delay in start of construction / implementation of the project / start of production upto six months, level of construction, quantum of plant & machinery ordered, the Managing Director shall be competent to take a decision in such cases on merits by charging appropriate fee on case to case basis. Such allottee shall be governed by EMP 2005 for any further extension in future and he shall give an undertaking to this effect.
GUIDELINES REGARDING PRESTIGIOUS PROJECTS INVOLVING INVESTMENT OF MORE THAN RS. 30 CRORE ALLOTTED UNDER ONGOING SCHEME
COMPLETION OF PROJECTS
The allottee will be deemed to have completed the project if he constructs the building as per the norms fixed below permissible covered area and starts commercial production within specified period as mentioned above, after installation of the plant and machinery.
The construction coverage norms applicable for the allotment/RLA issued by the Corporation w.e.f. 7.01.2008 are as under:-
| 1 | Upto 1 acre | 40% of PCA |
| 2 | Above 1 acre | 25% of PCA |
For other allottees, the construction coverage norms are as under:-
| 1 | Upto 1 acre | 25% of PCA |
| 2 | Above 1 acre upto 5 acres | 20% of PCA |
| 3 | Above 5 acres & upto 10 acres | 15% of PCA |
| 4 | Above 10 acres |
TRANSFER OF PLOTS/SHEDS
Transfer of plots/sheds shall be allowed only if the project has been completed and construction of building is as per the laid down norms. In case after implementation of project, the allottee is not able to continue to run the project for any reason whatsoever, he will be eligible to transfer the plot in favour of 3rd party with prior written permission of the Corporation. In such cases, the following fee structure shall be applicable :
The transferee shall not be allowed to further transfer the plot for at least one year from the date of transfer of the plot in his name.
In cases, where the Corporation has already allowed leasing permission to the allottee even without implementation of the project under the provisions of the policy in force from time to time and the lessee having already implemented the project on the premises and the allottee is not in a position to implement its own project, transfer of the industrial plots/sheds will be permissible by charging applicable transfer fee, subject to the condition that the allottee has achieved building construction coverage norms as per EMP-2005 and there are no zoning violations. However in such cases, the transferee will be required to implement its own project before further transfer of the industrial plots/sheds is effected in favour of another person by him.
However, the transfer of plot/shed will be allowed without the above conditions in case of inheritance, succession due to the death of the owner/majority shareholders or take over by public financial institutions. The change of management by transfer of majority shareholding shall also be treated as transfer under the policy.
The transfer fee structure shall be as under:
| Sr. No | Category | Plots (Rs. per sq. mtr.) |
Sheds (Rs. per sq. ft. of covered area) |
| 1 | Category A | 300 | 60 |
| 2 | Category B | 100 | 40 |
| 3 | Category C | 30 | 15 |
No transfer fee will be levied in cases of industrial units, which have been in commercial production for more than five years. Similarly, no transfer fee will be leviable in cases of transfers necessitated on account of inheritance, family transfer or take over by a financial institution. Only a processing fee of Rs. 5000/- will be charged in all such cases. However, prior permission is mandatory.
For transfer of plots/sheds, the transferor will apply to HSIIDC concerned with the following documents:
Statement of means of financing of the transferee
The allottee is required to submit his request for transfer within a period of 30 days from the date of agreement to sell, failing which penalty equivalent to the transfer fee will be imposed by the corporation.
HSIIDC will also not insist on submission of occupation certificate in cases of transfer and submission of a certificate for non-violation by the allottee shall suffice in terms of the provisions in the Industrial Policy-2005 announced by the State Government recently. In case violations are noticed later on, the transferee shall be responsible for rectifications.
In the event of non-implementation of project, on plot / shed on account of force majeure/exceptional circumstances, the request for transfer of plot / shed not falling under the provisions of the EMP shall be placed before the BoD for a decision.
All transfer requests received by the corporation after coming into force EMP-2005, shall be considered under the new guidelines. However, the requests for transfer of plots/ sheds received before implementation of EMP-2005 shall be dealt with in the following manner:-
Change in share holding will be allowed only if the original allottee or his family members (spouse, son, daughter, wife, parents, brothers, sisters, grand son, grand daugher) retain a minimum of 51% share in the project/company/firm. In case the original allottee and his family fail to retain the prescribed share holding of 51%, it would amount to transfer and dealt with under the relevant provisions. In case where a private limited company becomes a public limited company listed with recognized stock exchange, the change in constitution may be allowed subject to the condition that the allottee or his associates (family members), retain the largest share holding and having management control, otherwise it will be treated as a case of transfer. Processing fee of Rs.5000/- shall be charged in all such cases.
NOTE: The Board of Directors in its 292nd meeting held on 30.10.2006 has partially modified the provisions relating to transfer of plots/sheds, contained in EMP-2005, as hereunder:
In cases, where the Corporation has already allowed leasing permission to the allottee even without implementation of the project under the provisions of the policy in force from time to time and the lessee having already implemented the project on the premises and the allottee is not in a position to implement its own project, transfer of the industrial plots/sheds will be permissible by charging applicable transfer fee as per EMP-2005 subject to the condition that the allottee has achieved building construction coverage norms as per EMP-2005 and there are no zoning violations. However in such cases, the transferee will be required to implement its own project before further transfer of the industrial plots/sheds is effected in favour of another person by him.
CHANGE IN CONSTITUTION / SHAREHOLDING
Change in share holding will be allowed only if the original allottee or his family members (spouse, son, daughter, wife, parents, brothers, sisters, grand son, grand daugher) retain a minimum of 51% share in the project/company/firm. In case the original allottee and his family fail to retain the prescribed share holding of 51%, it would amount to transfer and dealt with under the relevant provisions. In case where a private limited company becomes a public limited company listed with recognized stock exchange, the change in constitution may be allowed subject to the condition that the allottee or his associates (family members), retain the largest share holding and having management control, otherwise it will be treated as a case of transfer. Processing fee of Rs.5000/- shall be charged in all such cases.
CHANGE OF PROJECT
The allottee may be allowed change of project, other things being equal, by HSIIDC without prejudice to the size of the plot and the prescribed schedule of implementation of the project. However, while permitting change of project factors such as pollution, high water consumption/effluent shall be considered. Processing fee of Rs.5000/- shall be charged.
LEASING/RENTING OF INDUSTRIAL PLOTS
In order to ensure optimum utilisation of the industrial areas/industrial estates, leasing/renting of premises of the building for permissible industrial activities will be allowed if the allottee has made construction as per the standard norms, achieved building construction coverage norms as per EMP-2005, there is no zoning violation and has implemented its own approved unit on the plot. In cases where the allottee has earlier leased out the plot/shed by taking permission from the Corporation under previous policy and lessee has implemented the project, the allottee shall be eligible to further lease out the plot. In case of transfer of industrial plot/shed, the transferee shall be eligible to further lease out the premises provided the unit on the aforesaid plot had been implemented by the allottee/transferee/lessee and one year has elapsed after implementation of the project.
Such permission will be granted on payment of processing fee as prescribed hereunder:
1. In case the allottee/reallottee retains 25% of the premises for his own manufacturing activities and leases/rents out the balance 75% of premises:
| Leasing period upto 5 years | 10% of the transfer fee |
| Leasing period more than 5 years | 25% transfer fee |
2. In other cases:
| Leasing period upto 5 years | 50% of the transfer fee |
| Leasing period more than 5 years | 100% transfer fee |
In case, the allottee has implemented his/her project and remained in production for a period of five years or more and thereafter approaches the Corporation for leasing permission, no fee shall be charged by the Corporation, except processing fee equivalent to Rs. 10,000/-
The fee shall be calculated on the basis of the built up area / plot area, whichever is higher and shall be payable from the date of lease @ prescribed at that time with interest, if applicable. The allottee is required to obtain prior approval of the corporation. In case of unauthorized leasing a penalty equal to the prescribed leasing fee shall be imposed. Interest on the amount of leasing fee shall be charged from the date of lease and on the penalty amount, it shall be payable after expiry of 30 days from the date of demand by the Corporation.
Multiple leasing shall be permitted as under: -
| Plot size (square meters) | Maximum number of leases |
| Upto 500 | 1 |
| More than 500 and upto 1500 | 2 |
| Above 1500 | 3 |
The permission for leasing once granted shall be valid for the period specified in the permission letter. The allottee shall be at liberty to change in tenants within the period specified in the permission letter subject to the allottee keeping HSIIDC informed about any change made in the tenants and getting the project of the lessee / tenant approved. In case of change of lease within the prescribed period, processing fee of Rs. 5000/- will be charged.
All requests received by the corporation after coming into force of EMP-2005, shall be considered under the new guidelines.
In case the premises is leased out to a concern/firm (owned by the original allottee/his family members with minimum 51% shares), subsidiary company or holding company of the allottee company/firm owned by original promoters of the allottee company and no lease rental is being charged by the allottee, in that case, Managing Director is authorized to waive of the leasing fee considering merits of each case.
BIFURCATION / FRAGMENTATION OF PLOT
Bifurcation of industrial plots of only five acres size and above will be permitted. Such plots can be bifurcated in not more than two plots subject to the condition that the sub-divided plots shall not be less than one acre, keeping in view the zoning regulations & fire safety. The bifurcation will be permitted only for industrial purpose and there will not be more than two tenants on the original plot, meaning thereby that only one tenancy each will be permissible on the sub divided plots. The said bifurcation will be subject to payment of bifurcation fee equivalent to transfer fee applicable in the concerned area, and the same will be chargeable on the bifurcated portion of the plot. Further, in case the allottee transfers the bifurcated plot to some other person, then separate transfer fee will also be leviable on the same.
GENERAL EXTENSION TO I.T. CASES
In terms of the provision in the amendment of IIDP in October 2003, general extension for two years was allowed to the I.T. Units which could not be implemented by 25.9.2003. All such I.T. units are being allowed time upto 31.12.2005 as general extension without any construction norms without payment of any fee. Further extension beyond three years shall be considered on the basis of the guidelines given above.
OCCUPATION CERTIFICATE
Building can be occupied on self-certification that the building is constructed as per approved building plan. The self-certification on occupation must be submitted not less than 15 days before the expiration of validity of sanctioned plan. In case self-certification is found contrary to the ground reality, double the compounding rates will be charged and a complaint against the Architect shall be sent to the Council of Architects and the Architect will be barred for future from practice in any of Estates developed by HSIIDC.
RESUMPTION / SURRENDER OF PLOTS
HSIIDC will be competent to resume plots in case an allottee defaults in complying with the terms & conditions of allotment/transfer/leasing etc. The resumption of plot would be approved by the competent authority of the allotting agency after giving proper show cause notice.
Upon resumption/surrender, the amount deposited by the allottee will be refunded after deducting 10% of the price of plot without any interest. The interest paid by the allottee shall also be forfeited.
The allottee will be free to remove the structure/debris, if any, within a period of two months of resumption order at his own cost, failing which it shall be removed at the allottee's cost. It may be clarified that the allottee shall not be entitled to any payment/compensation for building constructed by him on the resumed plot.
RESTORATION OF RESUMED PLOTS
No restoration of resumed plots shall be allowed, however, appeal shall lie to a committee of Directors of HSIIDC headed by Principal Secretary Industries, MD/HFC and Director of Industries, Haryana as the other members against the order of competent authority ordering resumption.
FIXATION AND REVISION OF RATES OF PLOTS
The rates of plots and revision thereof will be finalized by a committee headed by Principal Secretary Industries and consisting of Director Industry, MD/HSIIDC and MD/HFC and approved by the State Government. The rates of the plots will be revised w.e.f. 1st April of the year and shall be valid for one year.
APPEAL
An appeal against the orders of the competent authority for resumption of industrial plots/sheds shall lie to a committee of Directors of HSIIDC headed by Principal Secretary Industries, MD/HFC and Director of Industries, Haryana as the other members against the order of competent authority ordering resumption. Atleast one member besides Principal Secretary Industries shall be present to complete the quorum. The appeal shall be filed in the office of Principal Secretary Industries, Haryana within 90 days of the resumption order.
All pending appeal cases presently lying before Principal Secretary Industries, shall also be heard by the aforesaid committee of Directors.
ANOMALIES
All anomalies arising out of the implementation of the above procedure shall be considered by a committee headed by Principal Secretary Industries with Managing Director/HSIIDC and Director Industries as its members.
The provisions of this Estate Management Procedure-2005 relating to transfer, leasing etc. shall also be applicable for industrial plots/sheds already allotted under the previous policies / procedures.
Annexure -I
NOTIFICATION
Dated:24thMay2007
In order to facilitate the allotment of plots to large number of applicatants in the different Industrial Estates of Haryana State Industrial Development Corporation and Haryana Urban Development Authority, the Governor of Haryana hereby notifies that in the Haryana Industrial Policy 2005, in Chapter-XII, for clause (iii), the following clause shall be substituted , namely:-
"(iii)The application in respect of all these categories shall be made to and processed by Haryana State Industrial Infrastructure Development Corporation or Haryana Urban Development Authority, as the case may be".
This amendment shall come into force with effect from the date of issue of this notification.
P.K. Chaudhery
Financial Commissioner & Principal Secretary
to Govt. Haryana, Industries Department
Chandigarh
Annexure - II
Haryana Government
INDUSTRY DEPARTMENT
NOTIFICATION
Dated 13th March, 2007
No.49/40/07-4IBI : In paritial modification of the notification issued by Govt. vide no. dated 6.6.2005, the Governor of Haryana is pleased to order that entrepreneurs with disabilities as defined in the Persons with Disabilities (Equal Opportunities, protection of Right and Full Participation) Act.,1995 shall be allotted industrial plot on preferential basis upto 2% of the total number of industrial plot available for allotment for the establishment of industrial unit. However, same price of plot would be charged as applicable to general category. The interest on instalment to be paid shall be 7% and the penal interest, if any, shall be @11%. A person with disabilities shall be eligible for allotment of industrial land :
if he is a bonafied resident of Haryana for the last three years preceding the date of application. For this, the applicant shall have to give sufficient proof viz. name in the voter's identity card, ration card, electricity connection, water connection etc.
he has attained the age of 18 years on the date of application.
he has not been allotted any industrial plot earlier in his/her name or in the name of his/her spouse.
he is a person with disability as defined in the Persons with Disabilities (Equal Opportunities, Protection of Right and Full Participation) Act,1995 and a certificate to this extent is issued by the Disability Board Constituted for the said purpose by the State Govt. of Haryana.
The difference in amount due to less rate of interest on installement shall be paid by the Department of the developing agency.
The policy shall come into force with immediate effect.
P.K. Chaudhery
Financial Commissioner & Principal Secretary
to Govt. Haryana, Industries Department
Chandigarh
| Industrial Estate/Distance from Delhi | Location and industrial Highlights | Existing type of Industries |
| IMT, Manesar 50 Kms (Developed Project) (Ph-I) Ph - II, III & IV (Current Project) |
On National Highway No.8 about 32 Kms. From Indira Gandhi International Airport.Focus on Hi-technology, Hi-precision, Non-polluting Units. | Automobile Industries, Readymade Garments, IT enabled services, Packaging industries |
| Growth Centre Bawal Phase-I 90 Kms.
(Developed Industrial Estate) (Phase II is a Current Project) |
On National Highway No.8 about 90 Kms. From New Delhi. | YKK Ltd, Svedala Ltd, TDT copper Ltd, Beckton & Dickinison etc |
| Udyog
Vihar, Gurgaon 20Kms Ph-I to VI (Developed Industrial Estate) |
On National Highway No.8 about 6 Kms.
From Indira Gandhi International Airport. Prestigious units such as Maruti Udyog Ltd., IDPL, Lumax, Hindustan Computers, etc. are located at Gurgaon. |
Strictly pollution free Industries, electronics, electrical, Pharmaceutical, light engineering, auto parts/component and ready-made garments. |
Kundli |
On National Highway No.1, just on Delhi-Haryana border in Sonepat District. Atlas Cycle Industries, Hilton Rubbers, ECE Industries Ltd. etc. nearby. | General engineering, cycle parts, dairy products and agro-based industries. |
| Kundli Expansion (Current Project) | Land measuring about 450 acres has been acquired and the development work is in progress. | |
| Faridabad 20 Kms (Developed Industrial Estate) |
One of the largest industrial towns of the country on Delhi-Mathura Highway. Excellent infrastructure facilities available | Mainly light engineering items. |
| Murthal 50 Kms.(Developed Industrial Estate) |
On National Highway No.1. Haryana Breweries, Indo Asian Fuse gear etc. nearby | General engineering, maltery, chemicals and cycle parts. |
| Ambala 200Kms. (Developed Industrial Estate) |
National Highway No.1. Well connected by rail. Has rich base
of scientific instruments industries. 20% of country's export of scientific instruments from here. It has UNDP assisted instrument design and development centre |
Scientific instruments, electronic and light engineering. |
| Tohana 200 Kms (Developed Industrial Estate) |
A centrally declared backward area with rich agriculture base. A number of agro projects in the pipeline. A Rs.45 crore project promoted by Nuchem Plastics Limited. | Agriculture implements foundry and light engineering. |
| Yamuna Nagar 200Kms. (Developed Industrial Estate) |
Known for its timber and light engineering industry on Yamuna bank. The 'brass town'- Jagadhri adjacent. Large industries like Indian Sugar and General Eng. Corp. Ballarpur Industries, Bharat Starch & Chemicals, Jamuna Auto, Kay Iron works, etc. located here. | Light engineering components for sugar mills. |
| Jind 120 Kms. (Developed Industrial Estate) |
Well connected by rail & road with potential for agro-based, leather-based products & chemical industries. M/s Haryana Leather Chemicals, I.C.I. etc., located | Process house and light engineering |
| Samalkha 70 Kms. (Developed Industrial Estate) |
On National Highway No.1 well linked by rail. | Light engineering and foundry. |
| Karnal Phase - I 125 Kms. (Developed Industrial Estate) Phase - II (Current Project) |
-do- |
Agriculture implements and general engineering. |
| Roz-ka-Meo 70 Kms. (Built up sheds) |
Close to famous Sohna tourist complex with benefits of the State declared backward area. Many auto parts manufacturing units including D.H Woodhead, Amtek Auto, etc., located here. | Components for Partap steels Ltd., Faridabad |
| IIDC Sirsa 250 Kms. (Developed Project) |
HSIIDC is also setting up an Integrated Infrastructure Development Centre at Sirsa for promoting Small Scale Industries. | |
| Hosiery Complex Barhi (Sonipat) -
57 Kms. Ph-I (Developed Project) Phase-II (Current Project) |
An Industrial Complex spreading over 500 acres has been planned at Barhi near Ganaur in District Sonepat. | |
| Industrial Estate Manakpur (Yamuna Nagar) 190
Kms. (Developed Project) |
The Corporation has acquired about 135 acres of land in Manakpur for setting up an Industrial Estate in Manakpur, District Yamuna Nagar. | |
| Barwala 210 Kms. (Developed Project) | Adjacent to Panchkula. A state declared backward area, most pollution free location. | |
| Rai (35 Kms.) Developed Food Park Rai |
Modern Industrial Park with latest infrastructure facilities previously for small scale industries. | |
| Bahadurgarh (40 Kms) (Current Project) |
The Corporation has acquired about 675 acres of land for setting up Industrial Estate in Bahadurgarh Distt. Jhajjar | |
| Saha Growth Centre - Phase - I (180 Kms.) Phase
- II Food Park |
Land measuring 415 acres has been acquired & developed Land measuring 277 Acres in under process of acquistion Developed on 70 acres of land for food processing industry |
-- -- -- |
| Panchkula 230 Kms. (Developed Industrial Estate) (Built up Sheds) |
Adjacent to Chandigarh. A State declared backward area, most pollution free location. M/s Bharat Electronics Limited located here. HMT's tractor plant nearby. | Components for the tractor division of HMT. |
| Kalka 260 Kms. (Developed Industrial Estate) (Built up Sheds) |
Gateway to Simla, on Delhi-Simla Highway. Well linked by rail. Very near to Chandigarh. Picturesque surroundings. Benefits of state declared backward area available. | Components for Eicher Goodearch Ltd., Parwanoo. |
| Murthal (Sonipat) 50 Kms. (Developed Industrial Estate) (Built up Sheds) |
On National Highway No.1 Barhi/Hosiery Complex Dist. Sonepat located nearby. | Components for Atlas cycle Ltd., Sonipat |
Modern Industrial Estates in Haryana

LOCATION:
The 1750 acre ultra modern Integrated Industrial Park, IMT Manesar is ideally located to the National Highway 8 linking Delhi and Jaipur, just 17 kms from Gurgaon. It is the only one of its kind in the country and was conceived specifically to provide a platform of services and facilities that would put the state on the global map of industrial competitiveness.INFRASTRUCTURE AVAILABLE:
HSIIDC further acquired land in Phase -II
(180 acres), Phase III (600 acres) & Phase IV (650 acres) the infrastructure are in
full swing.
HSIIDC has already developed & provided all infrastructural facilities in 1750 acres
land intially acquired under Phase-I.
2. UDYOG VIHAR, GURGAON |
Conveniently located just 8 kms from the Indira Gandhi International Airport on NH-8, Udyog Vihar, Gurgaon offers facilities of international standards. The top-notch facilities render the most suitable address for MNCs and big corporate houses. Facilities available at Udyog Vihar, Gurgaon make it the place to set up an industrial base.
INFRASTRUCTURE AVAILABLE:
3. E P I P, K U N D L I |
INFRASTRUCTURE AVAILABLE:
4. HOSIERY AND TEXTILE PARK, BARHI |
Hosiery & textile park Barhi is ideally located on the NH-I, just 4 kms from Gannaur in district Sonipat. The park is spread over an area of 275 acres of which 150 acres is developed into freehold plots, now ready for occupation. An area measuring 330 Acres has further been acquired under Ph-II which shall now be developed.
INFRASTRUCTURE AVAILABLE:
LOCATION:
The 1200 acre Centre located on the NH-8, in district Rewari at a distance of 90 kms from the national capital. The centre is a mecca of industry specific infrastructure, service ancillaries, commercial services and other essential services all brought to the entrepreneurs under one roof. It caters to Auto Components, Light engineering, Chemicals, Machinery & Equipment's, Electronic Components, Pharmaceuticals, Textile products etc. INFRASTRUCTURE AVAILABLE:6. INDUSTRIAL ESTATE, BARWALA |
INFRASTRUCTURE AVAILABLE:
7. IIDC, MANAKPUR |
One of the most preferred destinations for entrepreneurs, it is located at a distance of 5 kms from Jagadhri in district Yamuna Nagar on the Jagadhari-Chachrauli road near the Jagadhri-Yamuna Nagar Urban Agglomeration (UA). It is infact one of the seven Agglomerations declared by the state.
INFRASTRUCTURE AVAILABLE:
| 8. IIDC, SIRSA |
Located on the NH-10, the state-of-the-art Integrated Industrial Development Centre, setup with assistance from the Govt. of India, is spread over 74 acres of land with modern infrastructure facilities. The Infrastructure leverage provided by HSIIDC caters to the needs of the entrepreneurs to come to Haryana and achieve high points in excellence.
INFRASTRUCTURE AVAILABLE:
Home ? About
Us ? Financial Services ? Industrial Infrastructure ? Project Promotion
Social Activities ? FeedBack ? News Letter ? Advertisements ? Future Plans ? Faq
©1999 Haryana
State Industrial and Infrastructure Development Corporation Ltd.,
Plot No:C-13-14, Sector 6,Panchkula-134109
Enquiries: (091)
172-2590481-83 Fax:2590474
E-mail: hsiidc@hry.nic.in, info@hsiidc.org
-o-o-o-